Our main floor is completely ripped out down to the studs, as is our master bathroom, powder room and laundry room. We're living in the basement (with a teeny 4x8' kitchen - while our fridge is still on the main floor; take a second to imagine that hassle every meal) and the guest bedroom. Luckily, our daughter's room is untouched - but with all the demolition and construction noise, naps are sporadic.
It's a real pain.
Three more months until the "optimistic" completion date, which I'm certain will be delayed, as getting the kitchen and bathroom layout done with the cabinet company has been a debacle.
I can't tell you how much I am looking forward to living in a real, complete and functional house again. It's already been six months since we moved from our house in Ontario to Calgary. Three months of ghetto rental house, half-unpacked, and now three months of this construction site, still not unpacked...
It will be nice to see our stuff again, and to put pictures on the walls, and call it our home.
A few "before" pictures, just for fun:
The kitchen, with cracked plastic "glass" blocks, a pantry, and a peninsula - now it is down to studs, no cabinets and the glass blocks have been taken out and filled in with wall. |
The master bathroom with a gross old jacuzzi tub. And hey, no door between bedroom and bathroom. |
More master bathroom with a shower insert (now gone). Note carpet throughout (ugh!) and also no door between toilet and bathroom! |
From the closet, looking through the bathroom to the bedroom. Everything in here is gone. |